Six Sigma Calculator: DPMO, Sigma Level, RTY and Cpk
By FindMySum · Last reviewed
A Six Sigma calculator turns defect counts into the numbers quality teams report: defects per million opportunities (DPMO), process yield and the sigma level. It also works the other way, from measurements: given specification limits, the process mean and its standard deviation, it gives the capability indices Cp, Cpk, Pp and Ppk and the expected parts per million outside the specification. Both halves use the same idea: how many standard deviations fit between the process and the point where it fails.
From defects to sigma level
Start with three counts: units inspected, opportunities per unit and defects found.
- DPU (defects per unit) = defects ÷ units.
- DPO (defects per opportunity) = defects ÷ (units × opportunities).
- DPMO = DPO × 1,000,000.
- Yield = 1 − DPO.
- Sigma level = Φ⁻¹(yield) + 1.5, where Φ⁻¹ is the inverse standard normal distribution.
Worked example (the default): 1,000 units, 5 opportunities each, 38 defects. DPO = 38 ÷ 5,000 = 0.0076, so DPMO = 7,600 and the yield is 99.24%. The z-value with 0.76% in the upper tail is 2.43, and adding the 1.5 shift gives a sigma level of about 3.93. The process is just under four sigma.
The sigma table
| Sigma level | DPMO | Yield |
|---|---|---|
| 1 | 691,462 | 30.85% |
| 2 | 308,538 | 69.15% |
| 3 | 66,807 | 93.32% |
| 4 | 6,210 | 99.379% |
| 5 | 233 | 99.977% |
| 6 | 3.4 | 99.99966% |
Each step up cuts defects by a large factor, and the steps get harder: going from 3σ to 4σ removes about 60,000 defects per million, while 5σ to 6σ removes about 230.
Why add 1.5?
The table assumes that a process measured over a short period will drift by about 1.5 standard deviations in the long run. Motorola built the convention into its Six Sigma programme in the 1980s: a process whose specification limits sit six short-term standard deviations from the mean will, after drifting, behave like one with the nearer limit 4.5σ away, which is 3.4 defects per million. Without the shift, 6σ would mean about 0.001 DPMO on one side. The shift is a convention, not a law of nature, and some practitioners report the unshifted Z; this calculator follows the standard tables.
Rolled throughput yield
Most products pass through several steps. If each step's first-pass yield is known, the probability that a unit gets through the whole process without any rework is the product:
RTY = Y₁ × Y₂ × … × Yₙ.
The default steps are 98%, 97% and 99.5%: RTY = 0.98 × 0.97 × 0.995 = 94.58%. Even with every step above 97%, more than one unit in twenty needs rework somewhere. Enter your own step yields in the advanced options.
Process capability: Cp, Cpk, Pp and Ppk
Capability compares the voice of the customer (the specification) with the voice of the process (its spread).
- Cp = (USL − LSL) ÷ 6σ. How many process spreads fit in the specification, if the process were centred.
- Cpk = min(USL − μ, μ − LSL) ÷ 3σ. The same, but measured to the nearer limit, so it penalises an off-centre mean.
- Pp and Ppk use the same formulas with the overall standard deviation of all the data, rather than the within-subgroup (short-term) standard deviation.
Worked example: a shaft diameter must be 9.95 to 10.05 mm. The process mean is 10.01 mm, the within-subgroup standard deviation 0.012 mm and the overall standard deviation 0.015 mm.
- Cp = 0.10 ÷ (6 × 0.012) = 1.39
- Cpk = min(0.04, 0.06) ÷ (3 × 0.012) = 1.11
- Pp = 0.10 ÷ (6 × 0.015) = 1.11
- Ppk = 0.04 ÷ (3 × 0.015) = 0.89
The spread would be acceptable (Cp 1.39) if the mean were centred at 10.00 mm, but the mean sits 0.01 mm high and the long-term spread is wider, so Ppk is below 1. The normal distribution puts about 3,860 parts per million outside the specification, nearly all above the upper limit. Centring the process is the cheapest fix.
Reading the indices
| Cpk | Nearer limit | Typical verdict |
|---|---|---|
| below 1.0 | under 3σ | not capable: sort, fix or widen the spec |
| 1.0 to 1.33 | 3σ to 4σ | marginal |
| 1.33 | 4σ | usual minimum for an existing process |
| 1.67 | 5σ | new processes, safety characteristics |
| 2.0 | 6σ | Six Sigma |
Short-term Z (the "Z bench" of the nearer limit) is 3 × Cpk, which links capability back to the sigma table: Cpk = 2 is a 6σ process.
Common mistakes
- Using Cpk on an unstable process. Capability indices only predict the future for a process in statistical control. Check a control chart first.
- Mixing up the standard deviations. Cp and Cpk use the within-subgroup σ; Pp and Ppk use the overall σ. Swapping them hides drift.
- Counting opportunities inconsistently. Change the definition and DPMO changes even if nothing improved.
- Assuming normality. Parts per million from Cpk are only as good as the normal assumption, especially in the far tails.
Related calculators
The standard deviation calculator computes σ from raw measurements, the z-score calculator finds tail probabilities for a single value, and the central limit theorem calculator explains why subgroup averages on a control chart are close to normal.
More questions
How do I count defect opportunities?
List the distinct, measurable ways a unit can fail to meet a customer requirement, and count only the ones you actually inspect. An invoice with a customer name, address, amount, tax code and due date has five opportunities. Inflating the count with trivial opportunities lowers DPMO without improving anything, so keep the definition fixed over time.
Can the sigma level be negative?
Yes, in theory. With the 1.5σ shift, a defect rate above about 93% gives a sigma level below zero. In practice any process with a sigma level below 2 (over 308,000 DPMO) needs basic stabilisation before a Six Sigma project makes sense.
Do I need normal data for Cpk?
The link between Cpk and parts per million assumes a normal distribution. For skewed data such as flatness, runout or cycle times, transform the data (Box-Cox) or use the percentile method from ISO 22514, otherwise the ppm estimate can be off by a factor of ten or more.
How much data do I need for a capability study?
A common minimum is 25 subgroups of 4 or 5 parts (about 100 to 125 measurements) from a stable process, checked on a control chart first. With 30 measurements the uncertainty in Cpk is roughly ±0.2 at 95% confidence, so small studies can't separate 1.33 from 1.67.
What is the difference between yield and rolled throughput yield?
Final yield counts units that eventually pass, including reworked ones. Rolled throughput yield counts only units that pass every step the first time, so it reveals the rework hidden inside a process. A process with 99% final yield can have an RTY of 80% if many units are fixed along the way.
Sources
This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.