Skip to content

Six Sigma Calculator

Calculate DPMO, DPU, yield and sigma level with the 1.5σ shift, rolled throughput yield, and process capability Cp, Cpk, Pp and Ppk from your spec limits.

Calculator Details

Sigma level:3.928σSee results ↓

Defects → DPMO and sigma level, or process capability from spec limits

Products, transactions or forms checked

Distinct ways each unit can be defective

Total defects across all units

Your Results

Sigma level: 3.928σ

Sigma level

3.928σ

7,600 DPMO

DPMO

7,600

Defects per million opportunities

Yield

99.24%

1 − DPO

DPU

0.038

Defects per unit

Rolled throughput yield

94.5847%

Across 3 steps

38 defects in 1,000 units with 5 opportunities each is 7,600 DPMO, a yield of 99.240% and 3.93 sigma (with the 1.5σ shift).

Compare scenarios

Save these inputs as a scenario, change them, and compare the results side by side.

Loading, available in a moment

Yield by step and rolled throughput yield

Yield by step and rolled throughput yield

Detailed Breakdown

Rolled throughput yield
StepStep yieldCumulative
Step 198%98%
Step 297%95.06%
Step 399.5%94.5847%
Sigma level table (with the 1.5σ shift)
Sigma levelDPMOYield
1σ691,46230.853754%
2σ308,53869.146246%
3σ66,807.293.31928%
4σ (nearest to you)6,209.6799.379033%
5σ232.62999.976737%
6σ3.3976799.99966%

DPMO = (1 − Φ(σ − 1.5)) × 1,000,000: the long-term defect rate of a process whose short-term capability is σ.

How This Calculator Works

How it's calculated

DPO = defects ÷ (units × opportunities) · DPMO = DPO × 1,000,000

sigma level = Φ⁻¹(1 − DPO) + 1.5

Your numbers: 38 ÷ (1,000 × 5) = 38 ÷ 5,000 = 0.0076, so DPMO = 7,600 and the yield is 99.24%. Φ⁻¹(1 − 0.0076) = 2.42758, plus the 1.5σ shift, gives 3.92758σ. Rolled throughput yield multiplies the step yields: 98% × 97% × 99.5% = 94.5847%.

Frequently Asked Questions

What is DPMO and how is it calculated?

Defects per million opportunities: DPMO = defects ÷ (units × opportunities per unit) × 1,000,000. If 1,000 invoices each have 5 fields that can be wrong and you find 38 errors, DPMO = 38 ÷ 5,000 × 1,000,000 = 7,600. Counting opportunities lets you compare simple and complex products fairly.

How is the sigma level calculated from DPMO?

Find the z-value whose upper tail equals the defect rate, then add 1.5: sigma level = Φ⁻¹(1 − DPMO/1,000,000) + 1.5. With the shift, 6σ is 3.4 DPMO, 5σ about 233, 4σ about 6,210 and 3σ about 66,800.

Why is there a 1.5 sigma shift?

Motorola observed that processes drift over time, so long-term performance is worse than a short-term study suggests. The convention assumes the mean drifts by 1.5 standard deviations, so a process with ±6σ short-term capability produces about 3.4 defects per million in the long run instead of 0.002. Some statisticians criticise the fixed 1.5, but it is the industry standard behind sigma tables.

What is the difference between Cp and Cpk?

Cp compares the width of the specification with the spread of the process (6σ) and ignores where the process sits. Cpk also accounts for centring: it uses the distance from the mean to the nearer spec limit, divided by 3σ. Cp = Cpk only when the process is exactly centred; an off-centre process has Cpk lower than Cp.

What is the difference between Cpk and Ppk?

Both use the same formula, but Cpk uses the within-subgroup (short-term) standard deviation, often estimated from R̄/d₂ on a control chart, while Ppk uses the overall standard deviation of all data, which includes drift between subgroups. Ppk shows what customers actually received; Cpk shows what the process could do if it stayed stable.

What is a good Cpk value?

Most industries ask for Cpk ≥ 1.33 (the nearer spec limit 4σ away) for an existing process and 1.67 for a new or safety-critical one; automotive PPAP uses these limits. Cpk = 1 means the nearer limit is only 3σ away, about 1,350 ppm out of spec on that side. A Six Sigma process has Cpk = 2.

What is rolled throughput yield?

The probability that a unit passes every step of a process the first time, without rework. Multiply the first-pass yields of each step: three steps at 98%, 97% and 99.5% give 0.98 × 0.97 × 0.995 = 94.58%. RTY is lower than any single step yield and exposes the hidden factory of rework that final yield hides.

Is a defect the same as a defective unit?

No. A defective unit can contain several defects. DPU counts defects per unit (it can exceed 1), while the share of defective units is a yield measure. DPMO uses defects and opportunities, so a unit with three wrong fields counts as three defects.

Included: DPU, DPO, DPMO, yield and sigma level with the conventional 1.5σ long-term shift (ASQ Quality Glossary), rolled throughput yield, and the capability indices Cp, Cpk, Pp and Ppk with expected parts out of spec for a normal process (NIST/SEMATECH e-Handbook §6.1.6; Montgomery, Introduction to Statistical Quality Control). You enter the within and overall standard deviations; the calculator does not estimate them from raw subgroup data. Left out: non-normal capability (Box-Cox or percentile methods), one-sided specs, Cpm (Taguchi), confidence intervals on Cpk, and control charts.

Six Sigma Calculator: DPMO, Sigma Level, RTY and Cpk

By FindMySum · Last reviewed

A Six Sigma calculator turns defect counts into the numbers quality teams report: defects per million opportunities (DPMO), process yield and the sigma level. It also works the other way, from measurements: given specification limits, the process mean and its standard deviation, it gives the capability indices Cp, Cpk, Pp and Ppk and the expected parts per million outside the specification. Both halves use the same idea: how many standard deviations fit between the process and the point where it fails.

From defects to sigma level

Start with three counts: units inspected, opportunities per unit and defects found.

  • DPU (defects per unit) = defects ÷ units.
  • DPO (defects per opportunity) = defects ÷ (units × opportunities).
  • DPMO = DPO × 1,000,000.
  • Yield = 1 − DPO.
  • Sigma level = Φ⁻¹(yield) + 1.5, where Φ⁻¹ is the inverse standard normal distribution.

Worked example (the default): 1,000 units, 5 opportunities each, 38 defects. DPO = 38 ÷ 5,000 = 0.0076, so DPMO = 7,600 and the yield is 99.24%. The z-value with 0.76% in the upper tail is 2.43, and adding the 1.5 shift gives a sigma level of about 3.93. The process is just under four sigma.

The sigma table

Sigma levelDPMOYield
1691,46230.85%
2308,53869.15%
366,80793.32%
46,21099.379%
523399.977%
63.499.99966%

Each step up cuts defects by a large factor, and the steps get harder: going from 3σ to 4σ removes about 60,000 defects per million, while 5σ to 6σ removes about 230.

Why add 1.5?

The table assumes that a process measured over a short period will drift by about 1.5 standard deviations in the long run. Motorola built the convention into its Six Sigma programme in the 1980s: a process whose specification limits sit six short-term standard deviations from the mean will, after drifting, behave like one with the nearer limit 4.5σ away, which is 3.4 defects per million. Without the shift, 6σ would mean about 0.001 DPMO on one side. The shift is a convention, not a law of nature, and some practitioners report the unshifted Z; this calculator follows the standard tables.

Rolled throughput yield

Most products pass through several steps. If each step's first-pass yield is known, the probability that a unit gets through the whole process without any rework is the product:

RTY = Y₁ × Y₂ × … × Yₙ.

The default steps are 98%, 97% and 99.5%: RTY = 0.98 × 0.97 × 0.995 = 94.58%. Even with every step above 97%, more than one unit in twenty needs rework somewhere. Enter your own step yields in the advanced options.

Process capability: Cp, Cpk, Pp and Ppk

Capability compares the voice of the customer (the specification) with the voice of the process (its spread).

  • Cp = (USL − LSL) ÷ 6σ. How many process spreads fit in the specification, if the process were centred.
  • Cpk = min(USL − μ, μ − LSL) ÷ 3σ. The same, but measured to the nearer limit, so it penalises an off-centre mean.
  • Pp and Ppk use the same formulas with the overall standard deviation of all the data, rather than the within-subgroup (short-term) standard deviation.

Worked example: a shaft diameter must be 9.95 to 10.05 mm. The process mean is 10.01 mm, the within-subgroup standard deviation 0.012 mm and the overall standard deviation 0.015 mm.

  • Cp = 0.10 ÷ (6 × 0.012) = 1.39
  • Cpk = min(0.04, 0.06) ÷ (3 × 0.012) = 1.11
  • Pp = 0.10 ÷ (6 × 0.015) = 1.11
  • Ppk = 0.04 ÷ (3 × 0.015) = 0.89

The spread would be acceptable (Cp 1.39) if the mean were centred at 10.00 mm, but the mean sits 0.01 mm high and the long-term spread is wider, so Ppk is below 1. The normal distribution puts about 3,860 parts per million outside the specification, nearly all above the upper limit. Centring the process is the cheapest fix.

Reading the indices

CpkNearer limitTypical verdict
below 1.0under 3σnot capable: sort, fix or widen the spec
1.0 to 1.333σ to 4σmarginal
1.334σusual minimum for an existing process
1.675σnew processes, safety characteristics
2.06σSix Sigma

Short-term Z (the "Z bench" of the nearer limit) is 3 × Cpk, which links capability back to the sigma table: Cpk = 2 is a 6σ process.

Common mistakes

  • Using Cpk on an unstable process. Capability indices only predict the future for a process in statistical control. Check a control chart first.
  • Mixing up the standard deviations. Cp and Cpk use the within-subgroup σ; Pp and Ppk use the overall σ. Swapping them hides drift.
  • Counting opportunities inconsistently. Change the definition and DPMO changes even if nothing improved.
  • Assuming normality. Parts per million from Cpk are only as good as the normal assumption, especially in the far tails.

Related calculators

The standard deviation calculator computes σ from raw measurements, the z-score calculator finds tail probabilities for a single value, and the central limit theorem calculator explains why subgroup averages on a control chart are close to normal.

More questions

How do I count defect opportunities?

List the distinct, measurable ways a unit can fail to meet a customer requirement, and count only the ones you actually inspect. An invoice with a customer name, address, amount, tax code and due date has five opportunities. Inflating the count with trivial opportunities lowers DPMO without improving anything, so keep the definition fixed over time.

Can the sigma level be negative?

Yes, in theory. With the 1.5σ shift, a defect rate above about 93% gives a sigma level below zero. In practice any process with a sigma level below 2 (over 308,000 DPMO) needs basic stabilisation before a Six Sigma project makes sense.

Do I need normal data for Cpk?

The link between Cpk and parts per million assumes a normal distribution. For skewed data such as flatness, runout or cycle times, transform the data (Box-Cox) or use the percentile method from ISO 22514, otherwise the ppm estimate can be off by a factor of ten or more.

How much data do I need for a capability study?

A common minimum is 25 subgroups of 4 or 5 parts (about 100 to 125 measurements) from a stable process, checked on a control chart first. With 30 measurements the uncertainty in Cpk is roughly ±0.2 at 95% confidence, so small studies can't separate 1.33 from 1.67.

What is the difference between yield and rolled throughput yield?

Final yield counts units that eventually pass, including reworked ones. Rolled throughput yield counts only units that pass every step the first time, so it reveals the rework hidden inside a process. A process with 99% final yield can have an RTY of 80% if many units are fixed along the way.

Sources

This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.

Spotted a wrong result or a bug? Report a problem

May we count your visits with Invoker Analytics? It keeps a random visitor number in your browser. Your calculator inputs are never sent. Privacy policy