Construction Loan Calculator: Draws, Interest and Holdback
By FindMySum · Last reviewed
Building a house is financed differently from buying one. Instead of handing over the whole loan on closing day, the lender advances it in stages as the work is done, and you pay interest only on what has been advanced. The construction loan calculator models that: it spreads the draws over the build, works out each month's interest-only payment, holds back the lien holdback where it applies, and then converts the loan into a regular mortgage and shows that payment.
How the draws work
A draw mortgage (or progress-advance mortgage) is approved for the full amount, but the money is released at stages of construction, after an inspector or appraiser confirms the work. A typical house has five stages:
- Foundation (about 15%)
- Framing and roof (25%)
- Lock-up: windows, doors, exterior (25%)
- Mechanical, insulation and drywall (20%)
- Completion (15%)
Lenders set their own percentages, so the calculator lets you type the schedule. It spreads the draws evenly over the construction period: with five draws over ten months, they are advanced in months 1, 3, 5, 7 and 9. Each draw usually carries an inspection or title update fee, which you can enter.
Interest during construction
You pay interest each month on the total advanced so far. Early on that is a small amount; by the last draws, it is close to interest on the whole loan. For Canadian fixed rates the annual rate is compounded semi-annually, so the monthly rate is (1 + rate ÷ 2)^(1/6) − 1; for US loans it is the rate ÷ 12.
With the default $600,000 loan at 6.45% over ten months and Ontario's 10% holdback, the interest-only payment rises from about $430 in month 1 to $2,864 in months 9 and 10. The build costs $17,471.92 in interest, plus $1,250 in inspection fees.
The lien holdback in Ontario
Ontario's Construction Act requires every payer on a construction contract to hold back 10% of the value of the work as it is supplied. The holdback protects subcontractors and suppliers: if the builder doesn't pay them, they can register a lien and claim against it. Draw lenders typically advance each draw net of the holdback and release it at the end, once the lien period has passed.
Because the holdback isn't advanced until completion, you don't pay interest on it during the build. In the default example, $60,000 is held back, and the build interest is about $1,940 lower than it would be without the holdback. Other provinces have their own lien acts and holdbacks; enter the percentage, or 0 for none. US states handle lien rights differently, usually without a statutory holdback on homes, so the US default is 0.
Converting to a mortgage
When the house is finished, the holdback is released and the full loan becomes an ordinary amortizing mortgage. With $600,000 at 4.79% compounded semi-annually over 25 years, the payment is $3,418.25 a month. Compare that with the build-period payments to plan the cash you need while you may also be paying rent.
In the US, a single-closing construction-to-permanent loan converts automatically, with one set of closing costs. A construction-only loan must be paid off with a new mortgage at completion, which means a second closing and the risk that rates have risen. Enter the second closing costs to see the difference.
Budgeting the whole project
The interest is only one cost of building. Lenders expect a contingency for overruns, and if the build costs more than the loan, you pay the difference before the next draw. Add appraisal, legal and permit costs, builder's risk insurance and development charges. For the costs of closing the mortgage itself, see the closing costs calculator; if the down payment is under 20% in Canada, the CMHC insurance calculator shows the premium, and the mortgage payment calculator covers the mortgage after completion in more detail.
More questions
Can I borrow to buy the land too?
Many lenders will finance the land with the first advance, or count land you already own toward your equity. If you own the lot outright, its value can cover much of the down payment. Ask the lender how it values the land and whether the first draw pays off any existing lot loan.
What happens if construction runs late?
You keep paying interest on the amount advanced for longer, and the conversion to a regular mortgage is delayed. Some lenders charge an extension fee or require the build to finish within a set time. In the US, Fannie Mae's single-closing loans allow no construction period over 12 months, and no more than 18 in total.
Is the rate fixed during construction?
Often the construction period is at a variable rate, such as prime plus a margin, and the permanent mortgage rate is locked separately. If your build rate is variable, try a higher rate in the calculator to see how much the interest could rise.
Who gets the holdback at the end?
The holdback belongs to the contractor, but it is paid only after the lien period expires without liens being registered, or after any liens are cleared. In Ontario that is generally 60 days after the contract is substantially performed; contracts from 2026 move to annual release.
Can I make principal payments during construction?
Usually yes, but most borrowers don't, because cash is tight while building. Any principal you repay reduces the balance the interest is charged on. The calculator assumes interest-only payments during the build.
Sources
This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.