Concrete Calculator: Volume, Bags and Cost for Slabs, Footings and Steps
By FindMySum · Last reviewed
A concrete calculator answers the one question you can't get wrong on pour day: how much concrete to order. Too little and you are left with a half-finished slab and a cold joint where the second load meets the first; too much and you pay for concrete you have to dump. This calculator works out the volume for four common shapes (slabs, footings, round columns and solid steps), adds a waste allowance, converts the total to cubic yards, cubic feet and cubic metres, counts premix bags and estimates the ready-mix cost. This article explains each formula, walks through the default example and covers the practical details that change the number.
Volume is length × width × depth, in consistent units
Every concrete estimate starts with the volume of the space the concrete fills. The calculator takes dimensions in feet, with one exception: slab thickness is entered in inches because that is how slabs are specified (a "4-inch slab"). It divides that thickness by 12 before multiplying.
| Shape | Formula used | Typical use |
|---|---|---|
| Slab | length × width × (thickness in inches ÷ 12) | Patios, walkways, shed and garage floors |
| Footing | length × width × depth | Strip footings, pads under posts |
| Round column | π × (diameter ÷ 2)² × height | Tube-form piers, deck and porch posts |
| Solid stairs | n(n + 1) ÷ 2 × width × tread run × rise | Steps cast on the ground |
The stair formula treats each step as a solid block resting on the ground, so the bottom step is one rise tall, the second is two rises tall and so on. Adding 1 + 2 + … + n gives n(n + 1) ÷ 2 blocks of width × run × rise. A landing at the top isn't included; calculate it as a slab and add it.
The result in cubic feet is then converted. A cubic yard is 3 × 3 × 3 = 27 cubic feet, and a cubic metre is the cubic foot multiplied by 0.3048³, using the exact definition of the foot (0.3048 m) given in NIST Special Publication 811.
Waste: why you always order more than the hole
The calculator adds a waste allowance to the measured volume, 10% by default. That covers concrete left in the truck chute and the wheelbarrow, spillage, forms that flex outward, and a subgrade that is never perfectly flat. Five per cent is enough for a carefully formed job on a well-compacted base; 10% is safer for a first-timer or uneven ground. Running out is far more expensive than a small surplus, because the second delivery often costs a short-load fee and the joint between the two pours is a weak point.
Worked example: the calculator's defaults
The calculator opens on a slab 10 ft long, 10 ft wide and 4 in thick, with a 10% waste allowance and a ready-mix price of $150 per cubic yard.
- Convert the thickness: 4 in ÷ 12 = 0.333 ft.
- Measured volume: 10 × 10 × 0.333 = 33.33 cubic feet.
- Waste at 10%: 33.33 × 0.10 = 3.33 cubic feet.
- Total: 33.33 + 3.33 = 36.67 cubic feet.
- In cubic yards: 36.67 ÷ 27 = 1.36 cubic yards, or 1.04 cubic metres.
- Bags: Quikrete's data sheet gives about 0.60 cu ft per 80 lb bag and 0.45 cu ft per 60 lb bag. 36.67 ÷ 0.60 = 61.1, rounded up to 62 bags of 80 lb; 36.67 ÷ 0.45 = 81.5, rounded up to 82 bags of 60 lb.
- Cost: 1.36 cubic yards × $150 = about $203.70 for the concrete alone.
Sixty-two 80 lb bags is about 2.2 tonnes (4,960 lb) of material to lift and mix by hand, which is why most people pour a slab this size from a truck. For a smaller job, the same tool shows how quickly bags add up: a single round pier 1 ft across and 4 ft tall comes to 3.46 cubic feet with the 10% allowance, or 6 bags of 80 lb.
A bigger slab
Change the inputs to a 20 × 12 ft parking pad 6 in thick and the calculator gives 132 cubic feet with waste, which is 4.89 cubic yards (3.74 cubic metres) and about $733 at $150 per yard. Going from 4 to 6 inches thick raises the volume by half, so thickness is the dimension to settle first.
How thick should it be?
Thickness is a structural decision, not just a quantity input. Four inches is the usual minimum for patios and walkways that only carry people. Driveways, garage floors and slabs that will carry vehicles or heavy equipment are commonly 5 to 6 inches, often with reinforcement and a thickened edge. In Canada, Part 9 of the National Building Code of Canada sets minimums for slabs on ground in houses and small buildings, and calls for stronger, air-entrained concrete where the surface faces freeze–thaw cycles and de-icing salt, such as garage floors, driveways and exterior steps. Provinces adopt the code with their own amendments and municipalities enforce it, so check with your local building department before pouring anything structural, especially footings for a deck, addition or garage.
Bags versus ready-mix
Premix bags contain cement, sand and stone; you add water. The yield printed on the bag is what matters, not the weight. Most Canadian stores sell 30 kg bags rather than the 60 lb and 80 lb sizes counted here, and a 30 kg bag yields a little less than an 80 lb bag, so divide the cubic feet result by the yield printed on your bag and round up. Ready-mix arrives already batched to a specified strength, which matters for exterior work. Plants sell by the cubic yard or cubic metre and usually charge extra for loads under a minimum, plus fees for waiting time, pumping or weekend delivery. The calculator prices only the concrete at your per-yard rate, using the exact volume rather than the rounded figure.
What the estimate leaves out
- Base material. Most slabs sit on 4 to 6 inches of compacted gravel. Estimate that with the mulch, gravel and soil calculator.
- Irregular shapes. Split an L-shaped or curved slab into rectangles and circles, run each one, and add them. The square footage calculator helps with the area.
- Hollow forms and block cores. Filling the cores of concrete block or insulated concrete forms uses the manufacturer's fill chart, not these formulas.
- Labour and finishing. Delivery, pumping, rebar, vapour barrier, expansion joints and sealer are separate costs.
Measure twice, compact the base, and order with a margin. If the job is structural, the code and a qualified contractor or engineer have the final word on thickness, strength and reinforcement; the calculator gives you the quantity to have that conversation with.
More questions
Should I order ready-mix or mix bags myself?
For anything up to about half a cubic yard, bags are usually simpler: a small slab or a few fence-post footings can be mixed in a wheelbarrow or a rented drum mixer. Past roughly one cubic yard, mixing by hand gets slow enough that the first batches start to set before the last ones are placed, and one cubic yard alone takes 45 bags of 80 lb. At that point a ready-mix truck, or a supplier that delivers small loads in a trailer, saves time and gives you consistent concrete.
Why does my measured slab take more concrete than the calculator says?
The calculator assumes a perfectly flat base and forms that don't move. In practice the subgrade dips in places, the gravel base settles under foot traffic, and wooden forms bow outward under the weight of wet concrete. A base that is 1/2 inch low across a 10 × 10 ft slab adds about 4 cubic feet, more than the 10% allowance on a small job. Compact and level the base carefully, and check it with a string line before ordering.
Does rebar or wire mesh reduce the amount of concrete I need?
Not by any amount worth counting. Reinforcing steel takes up well under 1% of the volume of a typical residential slab, so ignore it when you estimate. It is the waste allowance, not the steel, that decides whether you have enough.
How do I estimate a slab with a thickened edge?
Work it out in two parts. Run the calculator for the main slab at its normal thickness, then run it again as a footing for the thickened perimeter: use the total length of the edge, the extra width of the thickening and the extra depth below the slab. Add the two volumes together. Garage slabs and some shed bases are poured this way, and skipping the edge is one of the most common reasons people run short.
How long should I wait before walking or driving on new concrete?
Timing depends on the mix, temperature and curing, so follow the supplier's guidance. A common rule of thumb is about a day before light foot traffic and about a week before parking a car on a driveway. Concrete keeps gaining strength for weeks, and keeping the surface damp or covered for the first several days helps it reach its design strength. Cold weather slows all of this down a lot.
Can I convert the result to cubic metres for a Canadian supplier?
Yes, the calculator already shows cubic metres alongside cubic yards. Many Canadian ready-mix plants quote and sell by the cubic metre, often in increments of a quarter or half a cubic metre with a short-load charge below a minimum. One cubic yard is about 0.765 cubic metres, so a metric order looks smaller in number for the same amount of concrete.
Sources
This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.