Concrete Calculator

Estimate cubic yards, bags and cost of concrete for slabs, footings, columns and stairs

Calculator Details

Concrete Needed:1.36 cu ydSee results ↓

Slab or footing length

Slab, footing or stair width

Slab thickness; 4 in is standard for patios and walkways

5–10% covers spillage, uneven subgrade and form flex

Your supplier's delivered price

Your Results

Concrete Needed: 1.36 cu yd

Concrete Needed

1.36 cu yd

1.04 m³ · includes 10% waste

Volume

Cubic Feet

36.67

Cubic Metres

1.04

Before Waste

33.33 cu ft

Waste Allowance

3.33 cu ft

Bags or Ready-Mix

80 lb Bags

62

60 lb Bags

82

30 kg Bags

75

Ready-Mix Cost

$203.70

You need 1.36 cubic yards (36.67 cubic feet) of concrete for your slab project, or 62 bags of 80 lb concrete mix. This includes a 10% waste allowance. Estimated ready-mix cost: $203.70.

Compare scenarios

Save these inputs as a scenario, change them, and compare the results side by side.

Loading, available in a moment

Detailed Breakdown

Ways to buy 1.36 cu yd of concrete
OptionYield eachYou need
80 lb premix bags0.6 cu ft62 bags
60 lb premix bags0.45 cu ft82 bags
30 kg premix bags0.014 m³75 bags
Ready-mix at $150.00/cu yd—1.36 cu yd · $203.70

Volume 33.33 cu ft plus 10% waste (3.33 cu ft) = 36.67 cu ft.

How This Calculator Works

Frequently Asked Questions

How do I calculate how much concrete I need?

Multiply length × width × thickness, all in feet, to get cubic feet, then divide by 27 to get cubic yards. A 10 × 10 ft slab that is 4 in (0.333 ft) thick needs 33.33 cu ft, or 1.23 cubic yards (0.94 m³), before adding a waste allowance.

How much extra concrete should I order?

Add 5–10% for spillage, uneven subgrade and form flex. Running short mid-pour leaves a cold joint, so it is better to round up. Ready-mix suppliers sell in set increments and may charge a short-load fee for small orders; ask yours.

How many bags of concrete do I need?

Quikrete's data sheet for its Concrete Mix gives a yield of about 0.6 cu ft per 80 lb bag and 0.45 cu ft per 60 lb bag. One cubic yard (27 cu ft) therefore takes 45 bags of 80 lb or 60 bags of 60 lb. In Canada the usual bag is 30 kg, which yields about 0.014 m³ (Sakrete and Quikrete), so a cubic metre takes 72 bags. The calculator divides your total volume by the yield and rounds up to whole bags. For more than about a cubic yard, ready-mix delivery is usually easier.

I bought 30 kg bags. How many do I need?

This calculator counts 80 lb and 60 lb bags. Canadian stores mostly sell 30 kg (66 lb) bags; their yield is printed on the bag. Divide the cubic feet shown here by that yield and round up. Bag yield is roughly proportional to weight, so a 30 kg bag yields a little less than an 80 lb bag.

How thick should a concrete slab be?

Four inches is common for patios, walkways and shed floors; driveways and garage floors are often 5–6 inches. Thickness, reinforcement and base preparation for structural work are set by your local building code and engineer, so check them before you pour.

How is the volume of a round column calculated?

Volume = π × (diameter ÷ 2)² × height. A 1 ft diameter column 4 ft tall holds 3.14 cu ft (0.12 cubic yards). Tube forms are sold by inside diameter, so use that measurement.

How is the concrete for stairs estimated?

Each step is treated as a solid block resting on the ground, so the bottom step is one rise tall, the next two rises, and so on: the volume is n(n+1)/2 × width × tread depth × rise, with all dimensions in feet. A landing at the top is not included; add it as a slab.

How is the cost worked out?

The cost is your price per cubic yard × the exact cubic yards including waste, not the rounded figure shown. Delivery, short-load, pumping and finishing charges are not included. Enter your local supplier’s delivered price for a realistic estimate.

Includes the concrete volume with your waste allowance, premix bag counts and the ready-mix material cost. Not included: reinforcement (rebar, mesh), gravel base, forms, delivery, short-load, pumping or finishing charges, and stair landings. Bag yields (0.6 cu ft per 80 lb, 0.45 cu ft per 60 lb) are from the Quikrete Concrete Mix data sheet; the 30 kg yield (0.014 m³) is from the Sakrete (Sika Canada) data sheet. Other brands print their own yield. Unit conversions use exact NIST factors. For structural work, follow your local building code.

Concrete Calculator: Volume, Bags and Cost for Slabs, Footings and Steps

By FindMySum · Last reviewed

A concrete calculator answers the one question you can't get wrong on pour day: how much concrete to order. Too little and you are left with a half-finished slab and a cold joint where the second load meets the first; too much and you pay for concrete you have to dump. This calculator works out the volume for four common shapes (slabs, footings, round columns and solid steps), adds a waste allowance, converts the total to cubic yards, cubic feet and cubic metres, counts premix bags and estimates the ready-mix cost. This article explains each formula, walks through the default example and covers the practical details that change the number.

Volume is length × width × depth, in consistent units

Every concrete estimate starts with the volume of the space the concrete fills. The calculator takes dimensions in feet, with one exception: slab thickness is entered in inches because that is how slabs are specified (a "4-inch slab"). It divides that thickness by 12 before multiplying.

ShapeFormula usedTypical use
Slablength × width × (thickness in inches ÷ 12)Patios, walkways, shed and garage floors
Footinglength × width × depthStrip footings, pads under posts
Round columnπ × (diameter ÷ 2)² × heightTube-form piers, deck and porch posts
Solid stairsn(n + 1) ÷ 2 × width × tread run × riseSteps cast on the ground

The stair formula treats each step as a solid block resting on the ground, so the bottom step is one rise tall, the second is two rises tall and so on. Adding 1 + 2 + … + n gives n(n + 1) ÷ 2 blocks of width × run × rise. A landing at the top isn't included; calculate it as a slab and add it.

The result in cubic feet is then converted. A cubic yard is 3 × 3 × 3 = 27 cubic feet, and a cubic metre is the cubic foot multiplied by 0.3048³, using the exact definition of the foot (0.3048 m) given in NIST Special Publication 811.

Waste: why you always order more than the hole

The calculator adds a waste allowance to the measured volume, 10% by default. That covers concrete left in the truck chute and the wheelbarrow, spillage, forms that flex outward, and a subgrade that is never perfectly flat. Five per cent is enough for a carefully formed job on a well-compacted base; 10% is safer for a first-timer or uneven ground. Running out is far more expensive than a small surplus, because the second delivery often costs a short-load fee and the joint between the two pours is a weak point.

Worked example: the calculator's defaults

The calculator opens on a slab 10 ft long, 10 ft wide and 4 in thick, with a 10% waste allowance and a ready-mix price of $150 per cubic yard.

  1. Convert the thickness: 4 in ÷ 12 = 0.333 ft.
  2. Measured volume: 10 × 10 × 0.333 = 33.33 cubic feet.
  3. Waste at 10%: 33.33 × 0.10 = 3.33 cubic feet.
  4. Total: 33.33 + 3.33 = 36.67 cubic feet.
  5. In cubic yards: 36.67 ÷ 27 = 1.36 cubic yards, or 1.04 cubic metres.
  6. Bags: Quikrete's data sheet gives about 0.60 cu ft per 80 lb bag and 0.45 cu ft per 60 lb bag. 36.67 ÷ 0.60 = 61.1, rounded up to 62 bags of 80 lb; 36.67 ÷ 0.45 = 81.5, rounded up to 82 bags of 60 lb.
  7. Cost: 1.36 cubic yards × $150 = about $203.70 for the concrete alone.

Sixty-two 80 lb bags is about 2.2 tonnes (4,960 lb) of material to lift and mix by hand, which is why most people pour a slab this size from a truck. For a smaller job, the same tool shows how quickly bags add up: a single round pier 1 ft across and 4 ft tall comes to 3.46 cubic feet with the 10% allowance, or 6 bags of 80 lb.

A bigger slab

Change the inputs to a 20 × 12 ft parking pad 6 in thick and the calculator gives 132 cubic feet with waste, which is 4.89 cubic yards (3.74 cubic metres) and about $733 at $150 per yard. Going from 4 to 6 inches thick raises the volume by half, so thickness is the dimension to settle first.

How thick should it be?

Thickness is a structural decision, not just a quantity input. Four inches is the usual minimum for patios and walkways that only carry people. Driveways, garage floors and slabs that will carry vehicles or heavy equipment are commonly 5 to 6 inches, often with reinforcement and a thickened edge. In Canada, Part 9 of the National Building Code of Canada sets minimums for slabs on ground in houses and small buildings, and calls for stronger, air-entrained concrete where the surface faces freeze–thaw cycles and de-icing salt, such as garage floors, driveways and exterior steps. Provinces adopt the code with their own amendments and municipalities enforce it, so check with your local building department before pouring anything structural, especially footings for a deck, addition or garage.

Bags versus ready-mix

Premix bags contain cement, sand and stone; you add water. The yield printed on the bag is what matters, not the weight. Most Canadian stores sell 30 kg bags rather than the 60 lb and 80 lb sizes counted here, and a 30 kg bag yields a little less than an 80 lb bag, so divide the cubic feet result by the yield printed on your bag and round up. Ready-mix arrives already batched to a specified strength, which matters for exterior work. Plants sell by the cubic yard or cubic metre and usually charge extra for loads under a minimum, plus fees for waiting time, pumping or weekend delivery. The calculator prices only the concrete at your per-yard rate, using the exact volume rather than the rounded figure.

What the estimate leaves out

  • Base material. Most slabs sit on 4 to 6 inches of compacted gravel. Estimate that with the mulch, gravel and soil calculator.
  • Irregular shapes. Split an L-shaped or curved slab into rectangles and circles, run each one, and add them. The square footage calculator helps with the area.
  • Hollow forms and block cores. Filling the cores of concrete block or insulated concrete forms uses the manufacturer's fill chart, not these formulas.
  • Labour and finishing. Delivery, pumping, rebar, vapour barrier, expansion joints and sealer are separate costs.

Measure twice, compact the base, and order with a margin. If the job is structural, the code and a qualified contractor or engineer have the final word on thickness, strength and reinforcement; the calculator gives you the quantity to have that conversation with.

More questions

Should I order ready-mix or mix bags myself?

For anything up to about half a cubic yard, bags are usually simpler: a small slab or a few fence-post footings can be mixed in a wheelbarrow or a rented drum mixer. Past roughly one cubic yard, mixing by hand gets slow enough that the first batches start to set before the last ones are placed, and one cubic yard alone takes 45 bags of 80 lb. At that point a ready-mix truck, or a supplier that delivers small loads in a trailer, saves time and gives you consistent concrete.

Why does my measured slab take more concrete than the calculator says?

The calculator assumes a perfectly flat base and forms that don't move. In practice the subgrade dips in places, the gravel base settles under foot traffic, and wooden forms bow outward under the weight of wet concrete. A base that is 1/2 inch low across a 10 × 10 ft slab adds about 4 cubic feet, more than the 10% allowance on a small job. Compact and level the base carefully, and check it with a string line before ordering.

Does rebar or wire mesh reduce the amount of concrete I need?

Not by any amount worth counting. Reinforcing steel takes up well under 1% of the volume of a typical residential slab, so ignore it when you estimate. It is the waste allowance, not the steel, that decides whether you have enough.

How do I estimate a slab with a thickened edge?

Work it out in two parts. Run the calculator for the main slab at its normal thickness, then run it again as a footing for the thickened perimeter: use the total length of the edge, the extra width of the thickening and the extra depth below the slab. Add the two volumes together. Garage slabs and some shed bases are poured this way, and skipping the edge is one of the most common reasons people run short.

How long should I wait before walking or driving on new concrete?

Timing depends on the mix, temperature and curing, so follow the supplier's guidance. A common rule of thumb is about a day before light foot traffic and about a week before parking a car on a driveway. Concrete keeps gaining strength for weeks, and keeping the surface damp or covered for the first several days helps it reach its design strength. Cold weather slows all of this down a lot.

Can I convert the result to cubic metres for a Canadian supplier?

Yes, the calculator already shows cubic metres alongside cubic yards. Many Canadian ready-mix plants quote and sell by the cubic metre, often in increments of a quarter or half a cubic metre with a short-load charge below a minimum. One cubic yard is about 0.765 cubic metres, so a metric order looks smaller in number for the same amount of concrete.

Sources

This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.

Spotted a wrong result or a bug? Report a problem