This sod calculator works out how much sod to order for a new lawn in the units American sod farms and garden centers sell it: square feet, rolls and pallets. It measures the lawn as a rectangle, circle or triangle (plus any extra areas you add), adds a percentage for cutting around beds and edges, divides by the size of one roll or slab, and works out the pallets and the topsoil to spread underneath in cubic yards.
Worked example: a 30 × 25 ft back yard
The US page starts with a rectangular lawn 30 ft long and 25 ft wide, large rolls of 2 × 5 ft (10 square feet), pallets of 500 square feet, 5% extra and 4 inches of topsoil.
- Area: 30 × 25 = 750 square feet.
- With 5% extra: 787.5 square feet.
- Rolls: 787.5 ÷ 10 = 78.75, rounded up to 79 rolls.
- Pallets: 787.5 ÷ 500 = 1.6, so 2 pallets.
- Topsoil: 750 square feet × 4 inches = 250 cubic feet, about 9.26 cubic yards.
Choose the smaller 16 × 24 inch slab and the same lawn takes 296 pieces. Big rolls (often 42 inches wide and 50 to 100 ft long, laid by machine) suit large areas; enter their size as extra area or use the pallet count.
When to lay sod in the US
Sod can go down whenever the ground isn't frozen and you can water it, but it roots best when the grass is actively growing: late summer to early fall and spring for cool-season grasses in the North, and late spring to early summer for warm-season grasses in the South. Lay sod the day it arrives, because it heats up and dies on the pallet within a day or two in warm weather. Stagger the joints like brickwork, butt the edges tight without overlapping, roll it to press the roots into the soil and water until the soil underneath is wet several inches down.
Preparing the ground
Kill or strip the old grass and weeds, grade the soil so it falls away from the house, and set the finished soil about 1 inch below walks and driveways so the sod sits flush. A soil test through your county extension office tells you whether you need lime or fertilizer; it costs little and saves guessing.
Order sod a week or two ahead in spring, when sod farms are busiest, and arrange delivery for the morning you will lay it.
For a lawn measured in metres and square metres, use the sod calculator.