Paver Calculator: Pavers, Gravel Base and Sand for a Patio or Driveway
By FindMySum · Last reviewed
A paver patio is only as good as what's under it. Besides the pavers themselves, you need a compacted gravel base, a thin layer of bedding sand, joint sand, and something to hold the edges in place. This calculator works out all of them from the size of the area.
Step 1: the area and the pavers
Measure the area: length × width for a rectangle, or π × (diameter ÷ 2)² for a circle. Split odd shapes into pieces and add them as extra area.
Divide by the face area of one paver, after adding an allowance for cuts:
pavers = area × (1 + extra) ÷ paver face area, rounded up
Allow 5% for straight-sided areas and 10% or more for curves, circles, borders and herringbone patterns, which need many cuts.
Worked example (the Canadian default). A 4 × 3 m patio is 12 m². In 100 × 200 mm holland stone (0.02 m² each), 12 × 1.05 ÷ 0.02 = 630 pavers.
Step 2: the gravel base
The base carries the load and drains water. The Interlocking Concrete Pavement Institute recommends at least 10 cm (4 in) of compacted aggregate for patios and walkways; 15 cm (6 in) is common in Canada, where frost moves the ground. Driveways and soft or clay soils need a deeper base, typically 30 cm (12 in).
Loose gravel shrinks as you compact it, so order more than the compacted volume. Suppliers commonly add 15 to 25%; the calculator adds 20%.
For the example: 12 m² × 0.15 m × 1.2 = 2.16 m³. Crushed gravel weighs about 1.6 tonnes per cubic metre, so that is about 3.5 tonnes. Compact it in layers of about 10 cm with a plate compactor, and extend it about 15 cm beyond the edges of the pavers.
Step 3: bedding sand
Pavers sit on a screeded layer of coarse, washed concrete sand. The guide specification for concrete pavers in Canada calls for a nominal 25 mm, never more than 40 mm: a thick bed lets pavers rut. For the example: 12 m² × 0.025 m = 0.3 m³, or about 0.46 tonnes. Don't use stone dust or mason sand for bedding.
Step 4: joint sand and edges
- Polymeric sand fills the joints and hardens when wetted, resisting weeds and ants. Coverage varies with the joint width and paver depth, from about 3 to 10 m² per 25 kg bag; check your bag.
- Edge restraint holds every edge that isn't against a wall or foundation. The example's perimeter is 14 m; with 4 m against the house, it needs 10 m of edging, or five 2.44 m (8 ft) pieces.
Building it
- Call before you dig to locate buried utilities.
- Excavate to the base depth plus sand and paver thickness, sloping about 2% away from the house.
- Compact the soil, lay geotextile on clay, then add and compact the base in layers.
- Screed the sand, lay the pavers without walking on the screeded sand, and cut the edges.
- Install the edge restraint, compact the pavers, sweep in joint sand and compact again.
What the calculator leaves out
Excavation volume, geotextile, steps and walls, drainage, permeable paver systems and delivery minimums. Use the mulch, gravel and soil calculator for other aggregates, and the retaining wall calculator if the patio needs a wall.
More questions
How far should I dig for a paver patio?
The base depth plus the bedding sand plus the paver thickness. For a 15 cm base, 2.5 cm of sand and 6 cm pavers, dig about 23.5 cm below the finished surface, then slope the excavation away from the house (about 2%, or 2 cm per metre) so water drains.
Can I lay pavers directly on sand without gravel?
Not for a lasting patio or anything you drive on. Sand alone washes out and shifts, and the pavers settle unevenly. A compacted crushed-gravel base spreads the load and drains water; the thin sand layer is only for bedding the pavers level.
What is the difference between pavers and slabs?
Interlocking pavers are small, thick units (usually 60 to 80 mm) whose joints lock together, which is why they suit driveways. Slabs are larger and thinner, used for patios and walkways; large slabs need a very flat base and don't suit vehicles unless the maker rates them for it.
Should I use geotextile under the base?
On clay or soft, wet soils, a woven geotextile between the soil and the gravel keeps them from mixing and makes the base last longer. On firm, well-drained soil it is often skipped for patios. Driveways on clay benefit most.
How long before I can use a new paver patio?
You can walk on it once the joints are filled and compacted. Polymeric sand usually needs 24 to 48 hours of dry weather to cure before heavy use or rain, and a day or more before vehicles on a driveway; follow the product's instructions.
Sources
This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.