How many reinforcing bars a slab or footing grid needs, with cover, lap splices, stock lengths, chairs and weight, for CSA metric (10M, 15M) and US (#3, #4) bars.

Calculator Details

Stock bars to buy:25 × 6 mSee results ↓

Metres and millimetres, or feet and inches

CSA metric bars in Canada, US inch-pound bars in the US

Length the bars are sold in

Outside dimension of the concrete

For a strip footing, its width

Centre to centre; from your drawing (400 mm / 16 in is a common residential grid)

Concrete between the bar ends and the edge (75 mm / 3 in against soil)

Your Results

Stock bars to buy: 25 × 6 m

Stock bars to buy

25 × 6 m

10M (11.3 mm): 10 bars one way, 15 the other

Total bar

116.3 m

No laps needed

Weight

91.3 kg

Chairs

20

Quantities for a layout, not a reinforcement design: bar size, spacing, cover and lap lengths come from your drawings, an engineer or your building official (CSA A23.3, ACI 318).

A grid of 10M (11.3 mm) bars at 400 mm each way needs 10 + 15 bars, 116.3 m in all: 25 stock bars of 6 m, about 91.3 kg, on 20 chairs.

Compare scenarios

Save these inputs as a scenario, change them, and compare the results side by side.

Loading, available in a moment

Detailed Breakdown

Bars each way
BarsCountEach (m)Pieces per barTotal with laps (m)Stock bars
Along the length105.85158.510
Along the width153.85157.815

How This Calculator Works

How the bars are counted

Bars = ⌊(side − 2 × cover) ÷ spacing⌋ + 1; each bar = other side − 2 × cover

Long bars are lapped: pieces = ⌈(length − lap) ÷ (stock − lap)⌉; weight = total length × mass per metre

Your numbers: (4 m − 2 × 75 mm) ÷ 400 mm + 1 = 10 bars along the length; (6 m − 2 × 75 mm) ÷ 400 mm + 1 = 15 along the width; 116.3 m = 91.3 kg.

Frequently Asked Questions

How much rebar do I need for a slab?

Count the bars each way: (slab width − 2 × cover) ÷ spacing + 1 bars run along the length, and the same across. A 6 × 4 m slab with 75 mm cover and bars at 400 mm each way takes 10 bars of 5.85 m and 15 bars of 3.85 m: 116 m of bar, or 25 bars of 6 m stock.

How much does rebar weigh?

Canadian metric bars (CSA G30.18): 10M 0.785 kg/m, 15M 1.570 kg/m, 20M 2.355 kg/m, 25M 3.925 kg/m, 30M 5.495 kg/m. US bars (ASTM A615): #3 0.376 lb/ft, #4 0.668 lb/ft, #5 1.043 lb/ft, #6 1.502 lb/ft, #8 2.670 lb/ft. A 6 m length of 10M weighs about 4.7 kg.

What do 10M and 15M mean?

They are CSA metric bar designations, named for the rounded nominal diameter: 10M is 11.3 mm and 15M is 16 mm across, with nominal areas of 100 and 200 mm². US bars are numbered in eighths of an inch: #4 is ½ in, #5 is ⅝ in.

How long should rebar laps be?

Long enough to transfer the force from one bar to the next. The calculator uses 40 bar diameters as a planning default (about 450 mm for 10M, 640 mm for 15M), but the required tension lap under CSA A23.3 or ACI 318 depends on the concrete strength, bar size, cover and position; follow your drawings. Stagger laps so they don't all line up.

How much concrete cover does rebar need?

For concrete cast against and permanently exposed to earth, such as footings, CSA A23.1 calls for 75 mm (3 in). Slabs on grade and walls need less, typically 40 to 50 mm, depending on exposure. Cover protects the steel from rust and fire; chairs or bricks hold the mat at the right height.

Does a garage or patio slab need rebar?

Many residential slabs on grade are built with welded wire mesh, fibres or light rebar mainly to control cracking, and some have none. Garage slabs, slabs on poor soil and structural slabs need reinforcement as designed. Check your municipality’s requirements and permit drawings.

How many rebar chairs do I need?

Enough to keep the mat from sagging when people walk on it: roughly one every 1.2 m (4 ft) each way for 10M or #4 bars, closer for lighter bars. A 6 × 4 m slab takes about 20. Match the chair height to the cover you need.

Not a reinforcement design: your drawings, an engineer or your building official set bar size, spacing, cover and laps (CSA A23.1/A23.3, ACI 318). Bar diameters and masses are CSA G30.18 and ASTM A615 nominal values from distributor tables (standards not opened); the 40-diameter lap, 75 mm cover, spacing and chair spacing are planning defaults. It counts a single rectangular mat with straight bars and simple cutting, and leaves out hooks and bends, top and bottom mats, dowels, corner bars, wall and column steel, tie wire, welded wire mesh, waste beyond the cutting, and stock-length tolerances. Prices are what you enter.

Rebar Calculator: Bars, Laps and Weight for a Slab or Footing

By FindMySum · Last reviewed

Reinforcing steel is laid out as a grid: bars at a set spacing running one way, and bars at the same or another spacing running the other way, kept back from the edges by a concrete cover. This calculator counts the bars, works out the laps where bars are longer than the stock you can buy, and gives the stock bars to order, the weight and the number of chairs.

Step 1: bars each way

For a slab or footing of length L and width W, with cover c and spacing s:

bars running along the length = ⌊(W − 2c) ÷ s⌋ + 1, each L − 2c long

bars running along the width = ⌊(L − 2c) ÷ s⌋ + 1, each W − 2c long

Worked example (the Canadian default). A 6 × 4 m slab with 75 mm cover and 10M bars at 400 mm each way: (4 − 0.15) ÷ 0.4 = 9.6, so 10 bars of 5.85 m run along the length; (6 − 0.15) ÷ 0.4 = 14.6, so 15 bars of 3.85 m run across. That is 58.5 + 57.75 = 116.25 m of bar.

The same formulas work for a strip footing: a 0.6 m wide footing at 400 mm spacing gets 2 bars along its length.

Step 2: laps and stock bars

Bars come in stock lengths: 6 m and 12 m in Canada, 20 ft and 40 ft in the US. A bar longer than the stock is made of several pieces overlapped by a lap length. The calculator uses 40 bar diameters as a planning value (about 450 mm for 10M); the required lap under CSA A23.3 or ACI 318 depends on the concrete, bar size and cover, so use the length on your drawings.

pieces = ⌈(bar length − lap) ÷ (stock − lap)⌉

Short bars are cut from stock: a 12 m stock bar gives two 5.85 m bars or three 3.85 m bars. For the example with 6 m stock, each bar uses one stock bar: 25 stock bars. With 12 m stock it is 10.

Step 3: weight

Multiply the total length by the bar's nominal mass:

Canada (CSA G30.18)kg/mUS (ASTM A615)lb/ft
10M (11.3 mm)0.785#3 (⅜ in)0.376
15M (16.0 mm)1.570#4 (½ in)0.668
20M (19.5 mm)2.355#5 (⅝ in)1.043
25M (25.2 mm)3.925#6 (¾ in)1.502

The example's 116.25 m of 10M weighs about 91 kg.

Step 4: chairs and ties

Chairs hold the grid at the right height so it ends up inside the concrete with the cover it needs. Roughly one every 1.2 m (4 ft) each way keeps 10M or #4 bars from sagging under foot traffic; the example needs about 20. Tie the bars at intersections with tie wire: every intersection at the edges, and every second or third in the middle.

Cover

Cover protects the steel from moisture and fire. CSA A23.1 sets 75 mm (3 in) for concrete cast against and permanently exposed to earth, such as footings. Slabs on grade and walls need less, depending on exposure. Too little cover lets the bars rust and the concrete spall.

What the calculator leaves out

This is a quantity estimate, not a design. It does not choose the bar size or spacing, check strength, or include hooks, bends, dowels, corner bars, top and bottom mats, wall and column steel or welded wire mesh. Your drawings, an engineer or your building official set the reinforcement; the concrete calculator works out the concrete.

More questions

What is the difference between 400R and 400W rebar?

Both are CSA G30.18 grade 400 bars, with a minimum yield strength of 400 MPa. The W grade has a controlled chemistry that makes it weldable and more ductile, which structural drawings often require, especially in seismic regions. Use the grade your drawings specify.

Can I use rebar from the hardware store?

For non-structural work, such as a garden path or a small pad, often yes. For footings, foundations and structural slabs, use bar of the grade and size on your drawings, which is usually supplied by a rebar fabricator cut and bent to length. Check that the bars are marked with the grade.

Should rebar sit at the bottom of a slab?

No. Bars lying on the soil end up at the bottom of the concrete with no cover, where they rust and do little. A slab-on-grade mat usually sits in the upper middle of the slab on chairs; footings place bars near the bottom with 75 mm of cover. Your drawings show the position.

Is welded wire mesh a substitute for rebar?

Sometimes. Welded wire reinforcement controls shrinkage cracks in light slabs, and some codes and designs allow it in place of light rebar. It is useless if it ends up at the bottom of the slab, so it also needs supports. Structural slabs and footings usually need rebar as designed.

How do I cut and bend rebar?

Cut it with an angle grinder and an abrasive or diamond blade, a rebar cutter, or bolt cutters for small bars, wearing eye and hearing protection. Bend it cold with a rebar bender around the minimum bend diameter the standard sets; never heat bars to bend them. Cap exposed ends to prevent injuries.

Sources

This article explains how the calculator works and is general information, not financial, tax, legal or medical advice. Rules change; check the sources above or a qualified professional before you act.

Spotted a wrong result or a bug? Report a problem

May we count your visits with Invoker Analytics? It keeps a random visitor number in your browser. Your calculator inputs are never sent. Privacy policy